Details:

  • Reconstructed 71 aging balconies at a North Bethesda condominium community
  • Original balconies, built in the late '80s and early '90s, showed signs of water damage and deterioration
  • Detailed inspections revealed widespread leaks, wood rot, and missing waterproofing systems
  • Structural framing rehabilitation required in multiple locations
  • Masonry repairs and waterproofing where siding met brick to prevent further water intrusion
  • Exterior Medics provided dedicated on-site management, including an assistant manager for project oversight
  • Community coordinators maintained ongoing communication with the property manager, engineer, and residents
  • Prioritized safety, timely updates, and resident satisfaction throughout the project
  • Used high-quality materials and proven techniques to guarantee long-term durability and renewed curb appeal